1) Apply a continuous bead of sealant around the sides of the lavatory.
(SEALANT NOT PROVIDED WITH THE LAVATORY)
2) Continue by applying caulk to the back wall and top of the lavatory.
3) Wipe away any excess sealant and fill voids as necessary. Allow sealant to
set for approximately 30 minutes.
Faucet and Drain Connections (not supplied)
1) Connect the water supply to the faucet according to faucet instructions.
2) Connect and tighten the trap to the drain.
3) Turn ON the water supplies to the faucet.
4) Purge air from the HOT & Cold water by running the water for a few sec-
onds.
5) Fill the lavatory with water.
6) Check for leaks at the water supply and drain connections.
INSTALLATION PROCEDURE
Final Caulking
5