KPS-PA10 • Digital clamp meter
jack.
2 Set the rotary switch at desired 750V~ position.
3 Connect test leads across the source or load being measured.
4 Read voltage value on the LCD display..
AC Current measurement
1 Set the rotary switch at desired A~ position.
2 Press the trigger to open transformer jaw and to clamp one conductor only,
making sure that the jaw is firmly closed around the conductor.
3 Read current value on LCD display.
4 When only the figure "1" is displayed, it indicates overrange situation and the
higher range has to be selected.
Resistance measurement
1 Connect the red test lead to "Ω
" jack and black test lead to the "COM" jack
(The polarity of red lead is positive "+").
2 Set the rotary switch at desired "Ω
" position.
3 Connect test leads across the resistor to be measured and read LCD display.
4 If the resistance being measured is connected to a circuit turn off power and
discharge all capacitors before applying test probes.
Prueba continuidad con sonido
1 Connect red test lead to "Ω
" jack, black test lead to "COM" jack.
2 Set range switch to "
" position.
3 Connect test leads to two points of circuit to be tested. If continuity exists,
built-in buzzer will sound.
Diode test
1 Connect the red test lead to "Ω
" jack and the black test lead to the "COM"
jack (The polarity of red lead is positive "+".).
2 Set the rotary switch at "
" position.
3 Connect the red test lead to the anode of the diode to be tested and the
black test lead to the cathode of the diode.The approx. forward voltage drop
of the diode will be displayed. If the connection is reversed, only figure "1" will
be shown.
8.
SPECIFICATIONS
Accuracy is specified for a period of one year after calibration and at 18°C to
28°C (64°F to 82°F) with relative humidity to 80%.
14