Descargar Imprimir esta página

Milwaukee 2970-20 Manual Del Operador página 78

Tiralíneas de inspección de tubería flexible
Ocultar thumbs Ver también para 2970-20:

Publicidad

Idiomas disponibles

Idiomas disponibles

5
Camera Heads and Spring Assembly
5.5.7 Installing the Barrel Skid with 100' Flexible Pipeline
Inspection Reel Spring Only
1. Fully open the barrel skid, place the spring into the
skid.
2. Close the barrel skid and pinch the ends together
while listening for the locking clicking sound.
5.5.8 Installing and Removing the Star Skid
The Star skid can be used in various configurations, alone or combined with the barrel skid.
Installation
1. Fully open the star skid, place the spring into the skid.
2. Close the star skid and pinch the ends together while
listening for the locking clicking sound.
1
2
3
5
4
1. Release lever
2. Catch plate
3. Retention rib
4. Hinge
5. Skid fins
74

Publicidad

loading

Este manual también es adecuado para:

2971-202972-202973-202974-202975-202976-20 ... Mostrar todo