Descargar Imprimir esta página

JUMO hydroTRANS S10 Manual Breve página 39

Ocultar thumbs Ver también para hydroTRANS S10:

Publicidad

Idiomas disponibles

Idiomas disponibles

5
Mounting
Aids
Materials
Requirements:
The system has been de-energized and secured against being switched on again.
The mounting holes have been drilled.
 chapter 4.8 "Dimensions", Page 12
Procedure:
1. Unlock the snap-in hook on the
housing front (1).
2. Remove the housing front and
place it down, taking care to pro-
tect it from pollutants.
3. Guide the connecting cable
through the connection opening
on the housing rear (2).
4. Mount the housing rear to the
wall. Tighten the fastening
screws.
Tightening torque: < 0.5 Nm
CAUTION!Risk of incorrect
measurement results due to
ingress of air through the
connection opening on the
device.
When mounting the device on a
flush-mounted box, seal the
connection opening air-tight us-
ing suitable sealing material.
5. Complete the electrical connection.
 chapter 6 "Electrical connection", Page 15
Cross-headed screwdriver
3 fastening screws
(1)
(2)
5 Mounting
13

Publicidad

loading