Installation
7. Attach the extractor hood.
Adjust the height and align horizontally
with the adjusting screws.
Remove air conduction plate
(see Activated-carbon filter).
Check that the 4 lower fixing holes
have been correctly marked. If required,
mark again.
8. Remove the extractor hood. Drill the
4 lower 8 mm ø fixing holes and press
in the wall plugs flush with the wall.
09. Attach the extractor hood and screw
into position with the remaining
4 screws.
10. Stick protective film over the holes of
the 2 lower mounting bolts in the
protective grid.
Re-insert air conduction plate
(see Activated-carbon filter).
11. Connect up the air outlet pipe.
12. Connect the hood to the electricity
supply.
13. Carefully remove the protective foil.
Avoid damage to the sensitive
surface.
14. Insert the upper flue duct (slots
downwards) into the lower flue duct.
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
15. Insert the complete flue duct at an
angle and swivel to the rear.
3.
1.
2.
31