iNSTALLATiON
STEP
2
Install
the
Header
Bracket
You can attach the header bracket either to the wall
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements.
Do not install the header bracket
over drywall,
if installing into masonry, use
concrete anchors
(not provided).
WALL HEADER BRACKET
INSTALLATION
* Center the bracket on the vertical centerline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
* Mark the vertical set of bracket holes. Drill 3/16"
pilot holes and fasten the bracket securely to a
structural support with the hardware provided.
Wail Mount
Optional
Mounting
Holes
Header
Wall
2x4
Structural
Support
VerticaI
Centerline
Lag Screws
5/16"x9x1-5/8"
/
HARDWARE
SHOWN
ACTUAL
SIZE
] J ] I I J I
Lag Screw
5/16"-9xl-5/8"
/
/
/
/
i
Highest Point of
Garage Door TraveI
Garage
Door
Vertical
Centerline
CEILING HEADER BRACKET
INSTALLATION
* Extend the vertical centerline onto the ceiling as
shown.
, Center the bracket on the vertical mark, no more
than 6" from the wall. Make sure the arrow is
pointing away from the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
, Mark the side holes. Drill 3/16" pilot holes and
fasten bracket securely to a structural support with
the hardware provided.
Ceiling Mounting
Holes
i
_'_
- Finished Ceiling -
/
Vertical Centedine
t
Header
_
Bracket
/_
/
6" Maximum
Door
Spring
Lag Screws
5/16"x9x1-5/8"
Header Wall
Centedine
14