Descargar Imprimir esta página

Linkoln SKF FlowMaster II A Serie Instrucciones Del Usuario página 8

Bomba hidráulica giratoria

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Place unit in approximate location making
sure electric and hydraulic power connec-
tions are accessible.
1 Mark center locations of six holes at bot-
tom of reservoir.
2 Drill six
/
in (13 mm) holes. Use of
1
2
(10 mm) bolts will offer some flexibility in
securing reservoir to equipment.
3 Connect lubricant outlet of pump to
system with suitable hose capable of
3 500 psi (241 bar) working pressure.
4 Connect hydraulic inlet with at least
/
in (9 mm) inner diameter hose capable
3
8
of at least 3 500 psi (241 bar) operating
pressure.
5 Connect hydraulic return to tank connec-
tion line with
/
in (19 mm) inner diame-
3
4
ter hose or pipe.
6 On model 85759, both flow rate,
2.0 gal/min (7.6 l/min), and pressure,
275 psi (19 bar), are factory set and
non-adjustable.
Operation
Fill reservoir
1 Clean area around filling port.
2 Remove lower (22) and upper (20)
pipe plugs from side of reservoir.
3 Attach appropriate bulk-filling pump to
/
in
lower inlet (1 in NPT).
7
16
4 Fill reservoir until grease appears at the
top (1
/
in NPT) vent high level port.
1
4
5 Remove bulk filling pump.
6 Replace both pipe plugs.
WARNING

Do not over pressurize reservoir
during filling.
Failure to comply may result in death
or serious injury.
Maintenance and
repair
General maintenance
• Keep area around pump clean. Clean off
filling port area prior to filling reservoir.
Clean area around filler after filling as
lubricants will attract dirt.
• Keep lubricants clean and free of dirt
and debris.

Disconnect all hydraulic or electric
power to equipment before performing
maintenance or service.
and/or serious personal injury.
System malfunction
• Refer to Troubleshooting (page 12) to
determine where to look if problems occur.
• Refer to corresponding sections for
replacement and repair of specific areas.
• Each part is identified with a number
keyed to a matching part on
illustrated views.
• General recommendations of tools
required are also specified in each step.
• Pay particular attention to warning
statements to prevent personal injury and
possible damage to pump components.
8
WARNING
Failure to comply can cause death

Publicidad

loading

Productos relacionados para Linkoln SKF FlowMaster II A Serie

Este manual también es adecuado para:

85759