Descargar Imprimir esta página

Seko PoolDose Double pH/ORP Manual De Instrucciones página 19

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

PoolDose | pH · ORP · Chlorine
15. HANDLING
Hose replacement:
Open the pump's lid and release the
hose by pulling the left connector
upward.
Position the roller at 7h05, turning
it in the direction of the circular
arrow.
*Tube replacement procedure valid for 2 and 3 rollers.
0000138994
Position the roller at 7h05, turning it
in the direction of the circular arrow.
Insert the left connector into the
relative housing and pass the hose
under the roller's guide. Turn the
roller in the direction of the circular
arrow, simultaneously accompanying
the hose into the pump's head, until
the right connector is reached.
rev. 3.2
EN
Completely
release
connector, holding it taut towards
the outside, and turn the roller in the
direction of the circular arrow so that
the hose is freed up to the right
connector.
Close the pump's lid and press its
surface hard so that it is properly
locked into place.
the
left
17

Publicidad

loading

Este manual también es adecuado para:

Pooldose double ph/orp/cloro