XI. Battery maintenance
[Battery model]
Model: MG14ZS-C
Capacity: 12V 11.2Ah
Standard charging: 1A~1.5A×6~8 hours
[Assembly and disassembly battery] (Figure 31)
Dismantling:
1. Open the seat cushion lock and remove the seat cushion;
EN
2. Open the battery box cover;
3. Remove the ECU bracket;
4. First remove the negative lead ( ━ );
Fig.32 Battery
5. Then remove the positive lead ( ╋ );
6. Remove the battery.
Installation:
1. The installation sequence is opposite to the removal steps.
2. Install the positive lead (╋ ) first, and then install the negative lead (━ ), and make sure the positive and negative
The pole terminal is not loose, and the positive and negative poles cannot be reversed. Reverse connection will damage electrical parts.
[Battery charging]
1. Remove the vehicle seat cushion.
2. Remove the battery tie, remove the positive and negative wires, and take out the battery.
3. Connect the charger wire and ensure that the charging current is 1/10A of the battery capacity. For example, if you charge a battery with a
capacity of 10Ah, its charging current is 1 ampere.
4. For detailed instructions on the charger, please contact your dealer.
[Inspection and maintenance of battery]
1. When used frequently, the motorcycle charging system automatically fully charges the battery. If the motorcycle is used occasionally or for a
short period of time, the battery power may be insufficient. The battery will self-discharge, and the self-discharge speed will vary with the battery
type and ambient temperature.
2. When the motorcycle is not used for a long time, the battery must be removed and stored after charging, and the battery should be charged
55