EQUIPMENT USE
8
- Wire type
- Type of gas
- Wire diameter
9
Job key
EN
Allows the storage and management of 240 jobs which can be personalised by the operator.
4. EQUIPMENT USE
4.1 Starting Screen
When switched on, the system performs a series of self-tests to verify its own correct functioning and that of the devices
connected to it. At this stage the gas test is also carried out to check the proper connection to the gas supply system.
4.2 Test screen
When the side panel (coil compartment) is open, the welding operations are inhibited.
The test screen appears on the LCD display.
5
4
3
1
Wire feed
Allows the manual wire feed without gas flow and without the wire live.
Allows the insertion of the wire into the torch sheath during the welding preparation phases.
Gas test
Allows the gas circuit to be cleansed of impurities and the carrying out of the appropriate preliminary gas pressure
and flow adjustments, without power on.
Wire speed
It allow wire speed regulation (during wire loading phase).
Minimum
0.5 m/min
Side panel open
Heading
Allows the display of certain pieces of important information relating to the selected process.
4.3 Main Screen
1
Wire feed
Gas test
2
3
Wire speed
Side panel open
4
5
Heading
2
Maximum
Default
22.0 m/min
3.0 m/min
66