Installing a UVC clarifier separately
• The UVC clarifier may only be installed horizontally pointing downward or vertically on a firm
base.
– For horizontal installation, the inlet for pump connection must be at the bottom, so that no
air can accumulate in the water housing of the UVC clarifier.
– Allow sufficient space for carrying out maintenance work. At least 600 mm of space must be
kept clear for dismantling and installing the unit head.
• For installation below the level of the water, fit a slide valve in the water supply pipe so that
the unit can be partially or completely sealed off for controlling the flow or for performing
maintenance work.
– Recommendation: Slide valve DN 110 (OASE art. 27171).
• If the pump is installed at a dry location, the pressure-side and suction-side connection thread
must be sealed with Teflon tape.
EN
BTN0045
39