Commissioning - Elster Instromet RVG Manual De Instrucciones

Contador de gas de pistones rotativos
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 70
Flow (horizontal)
from left to right
E = Oil filler neck
A = Oil drain sleeve
Figure 7: Horizontal and vertical installation positions, oil filling and oil-level display for Type
RVG-ST
Flow direction
Horizontal
Vertical
Table 4: Guide values for oil quantity on commissioning and for oil changes for Type
RVG-ST

9. Commissioning

In order not to damage the meter,
slowly fill the system until operating pressure is reached.
The pressure rise may not exceed 350 mbar/s. You should use a bypass line for filling
(recommendation: 12 mm pipe diameter).
Do no exceed the measuring range even briefly!
Conduct a tightness test!
Attention: you must please note the instructions in Section 3, „Operating Location".
14
O = Oil-level gauge glass
V = Screw plug
Oil-level gauge glass
On the front side
of the meter
On the side
of the housing cover
© Elster GmbH · All rights reserved · Subject to technical modification
Elster-Instromet
Flow (vertical)
from top to bottom
Oil quantity
Approx. 25 ml
Approx. 80 ml

Publicidad

Tabla de contenido
loading

Productos relacionados para Elster Instromet RVG

Este manual también es adecuado para:

Rvg-st

Tabla de contenido