Descargar Imprimir esta página

FITFIU FITNESS MUB3003P Manual Del Usuario página 51

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 3
A.
Attach the front upright (02) to the front upright base tube (38). Secure the front upright post (02), by
inserting two carriages boits (41) with two washers (37) and two nylon nuts (49).
B.
Attach the front upright post (02) to the front of the main frame (04). Secure the front upright post (02) by
inserting two hex head boits (46) with four washers (37) and two nylon nuts (49).
STEP 4
A.
Attach the leg lift (01) into the front upright post. Secure by using a half threaded hex head boit (44), two
washers (37), and tighten with a nylon nut (49).
B.
lnsert two foam roller tubes (11) into the top and bottom of the leg lift (01). lnsert four foam rollers (27) onto
each end of the foam
roller tubes (11).
Note: For ease of sliding
the foam rollers, spray
water inside of foam
roller before installing.
Then insert the small
inner plug (28) into the
foam roller tubes (11).
C.
lnsert the weight plate
adaptar (15) onto the
front leg developer and
secure by using a spring
clip (52).
C.
Attach the main frame (04) to the rear cross tube. Secure
by inserting two half threaded hex head boits (43) and two
washers (37) and tighten by using an enforcement plate
(16) and two washers (37) and two nylon nuts (49).
D.
Attach the stabilizer bar (12) to the bottom of the main frame
and front upright. Secure by using one half threaded hex
head boit (42), two washers (37) and one nylon nut (49).
51
WEIGHT BENCH MUB3003P
EN

Publicidad

loading