Descargar Imprimir esta página

GE ZV 30H Serie Instrucciones De Instalación página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
INSTALLATION - VENTED TO THE OUTSIDE
[3
MOUNTING
HOOD TO BOTTOM OF
CABINET (Continued)
Hood Installation without Riser:
e¢ Install the damper assembly on top of the hood
with 4 supplied Phillips screws.
¢ Lift the hood under the cabinet. Align the hood
and cabinet mounting holes. Use 4 supplied
wood screws and washers to secure the hood to
the cabinet.
* Drill two 1/8" pilot holes in the cabinet flange. Se-
cure with 2 additional wood screws, supplied. Be
careful when driving screws into the front flange.
¢ Install 4 wall screws into the anchors or studs to
complete the hood mounting.
cosiner_ |||)
|__|
flange Ot
bons
TT
TT
Wall screws
and washers for
anchors or studs
13
[ 4 CONNECTING DUCTWORK
e Install the ductwork by making connections in the
direction of the airflow.
e Secure joints in ductwork with sheet metal screws,
being sure to allow clearance for damper flaps to
open and close.
¢ Wrap all duct joints with aluminized duct tape for
an airtight seal.
e Use aluminized duct tape to secure the flange
connection. Reach inside the hood and push the
damper up to be sure it moves freely.
Screw
es
Aluminized
duct tape
Air flow

Publicidad

loading

Este manual también es adecuado para:

Zv30hsr1ss