Descargar Imprimir esta página

GE ZV 30H Serie Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Preparation
REMOVE THE PACKAGING
A CAUTION:
wear gloves to protect against
sharp edges. The vent hood is shipped secured to a
shipping board with 4 screws.
e Remove the accessories and Styrofoam
packaging.
Shion
ippin
\
e Lift the hood out of the box.
ood
9
* Remove and properly discard the plastic =
Nas MM frm
ON
=
wrapping.
\
\ S
* Remove metal grease filters and other
co
accessories.
j-—
¢ To remove the shipping board, locate and remove
Shipping
;
.
the 4 screws inside the hood on the left and right
screws
Packaging
Shipping screws
sides. Discard the shipping board.
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with
the hood and check contents.
Damper
assembly
Coe
Q R
4 Damper assembly
screws (supplied
with damper
assembly)
10 wall/cabinet
2 metal wall
screws
fasteners
Cabinet Template
31-10571
Ce)
Wall Template
31-10570
6 riser
10 flat
1 plastic
screws
washers
grommet
2 charcoal filters
NOTE: Additional tools, materials and hardware are
required to construct your wall framing support.

Publicidad

loading

Este manual también es adecuado para:

Zv30hsr1ss