Descargar Imprimir esta página

GE ZV 30H Serie Instrucciones De Instalación página 18

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
INSTALLATION - RECIRCULATING
[5 JINSTALLING CHARCOAL FILTERS
Charcoal filters must be installed for recirculation
installation.
To install:
1.Align the charcoal filter with the notch on the
plastic blower cover.
2.Turn the filter counterclockwise to lock into place.
Make sure both tabs are engaged on the char-
coal filter. Make sure the filters are secure.
[6 JINSTALLING BAFFLE GREASE FILTERS
AND DRIP TRAY
Installing Drip Tray
1.Lift drip tray with slots and filter channel toward
the front.
2.Align the tray with the hood drip tray channel and
ease into position.
rip tray
channel
18
[6 |INSTALLING
BAFFLE GREASE
FILTERS
AND DRIP TRAY (Continued)
Installing Baffle Grease Filters
1.Remove protective film.
2.Hold both filter knobs while positioning the front end
of the filter in the upper (front) filter channel. Pull the
filter as far forward as possible into the channel.
3.Lift the opposite end of the filter, aligning with the
rear (lower) filter channel.
4.Push the filter into the rear channel, allowing it to
settle into the rear channel.
5. Make sure filters are seated properly.
Front
with grease tray
__
Filter
fever
7
7
Filter
Filter
FINALIZE INSTALLATION
e Remove any remaining protective film from the
front face of the hood.
¢ Be sure fan and lights operate correctly. Refer to
the Owner's Manual for operating instructions and
Problem Solver.

Publicidad

loading

Este manual también es adecuado para:

Zv30hsr1ss