Descargar Imprimir esta página

Kohler Sonata K-1508 Guia De Instalacion página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Carefully move the module into
the recess.
Position right side of front
frame and header into recess
and nail into place.
Be sure the bottom of the
module is firmly supported
against the floor. Some framing
adjustments may be necessary.
However, no additional support
is required. The module must
be plumb and level to ensure
proper shower enclosure
installation.
Use #6 large head galvanized
nails to fasten the front and top
nailing-in flanges to 1" (2.5cm)
x 2" (5cm) braces at pre-drilled
18" (45.7cm) centers. Be
careful, when nailing, to
prevent possible damage to
finished surfaces.
Use #6 large-head galvanized
nails to fasten the nailing-in
flanges to the studs.
Connect the drain to the trap.
Rough-in the shower, valving,
and supply connections. Strap
the supply connections to the
stud framing.
Provide access to the
connections for future
plumbing maintenance.
Kohler Co., Kohler, WI U.S.A.
1" (2.5cm) x 2"
(5cm) Brace
7
#6 Large Head
Galvanized Nail
Nailing-In
Flange
A
1010410-2-

Publicidad

loading