10. Connect the discharge pipeline to the pump. A shut-off valve and a ball type check valve with full free passage should be installed using a
connection pipe having length at least 5 times the diameter of the outlet.
11. Clean the tank to remove any remaining debris and waste.
12. Secure the electric cables so that they cannot be twisted or torn.
13. Bring the cables out of the tank through a clean, smooth duct. Do not lay cables with tight bends which may be crushed or damaged.
14. Connect the electric cables to the control panel
4.9 Horizontal installation in dry chamber (TYPE Z)
For horizontal installation (TYPE Z), the pump has a fitting for fixing to the supporting metal structural work (KBS-H).
4.9.1 Installation procedure
(See APPENDIX 4 page 182)
1. Check that the pump is disconnected from the power supply panel and the impeller turns in the correct direction
2. Position the pump vertical on a firm, even surface.
3. Unscrew the screws which secure the lifting handle, if present, and remove it. As an alternative, unscrew and remove the eyebolts.
4. Secure the top bracket to the motor lid of the electric pump. Be very careful not to damage the electric cables.
5. Secure the spacer to the top bracket without tightening the fixing nuts.
6. Secure the bottom bracket to the body of the pump.
7. Using a plumb line, adjust the position of the spacer so that its supporting plate lines up with the bottom bracket; tighten the spacer nuts
8. Put the pump in position by using a suitable mechanical device (crane, tackle). Lift with a chain or sling of suitable size for the weight of the
pump. Take care since the pump, fixed to the metal structure, may swing as it is lifted off the ground.
9. Fix the system firmly to the bottom of the tank using chemical or expansion plugs. Use stainless steel metal fasteners or protect the screws and
nuts with a suitable product to prevent corrosion.
10. Connect the intake and outlet pipelines. A shut-off valve and a ball type check valve with full free passage should be installed using a connec-
tion pipe with length equal to at least 5 times the diameter of the outlet.
11. Clean the tank to remove any remaining debris and waste.
12. Secure the electric cables so that they cannot be twisted or torn.
13. Bring the cables out of the tank through a clean, smooth duct. Do not lay cables with tight bends or in positions with risk of crushing or damage.
14. Connect the electric cables to the control panel
4.10 Unspecified installation (TYPE X)
The pump has all the holes required for standard installation with Zenit accessories.
Refer to the technical sheet for a detailed illustration of the available holes.
X
(Fig. 10)
Zenit
accessory
A
DAC/KBC
B
DAC/KBC/KBS
C
DAC/KBC/KBS/KBS-H
E
DAC/KBC/KBS/FLX
Safety, Installation and Operations Manual – Translation of original instructions
10
Discharge
Suction
flange
flange
EN
43

Publicidad

loading