Descargar Imprimir esta página

Inferno LCD710 Instrucciones De Uso página 8

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42
Battery charger >
CHARGING STEPS
Voltage (V)
STEP
Current (A)
STEP 1:
DIAGNOSIS (Check if battery has connected with the charger and also check battery voltage).
STEP 2: DESULPHATION (If battery voltage is too low, programs automatically
generate pulsing current to remove sulphate, up to 10 minutes).
STEP 3: ANALYSE (Check if the battery voltage reaches to the threshold after
desulphation, and charging begins if the battery voltage is OK).
STEP 4: SOFT START (Charge with echelon constant current).
STEP 5: BULK (Charge with constant maximum current until battery
voltage is reached to the threshold).
STEP 6: ABSORPTION (Provide gradually declining current charge for maximum battery voltage).
STEP 7:
ANALYSE (Test if the battery can hold charge).
STEP 8: MAINTENANCE (Continuously monitor the battery, and charging
current will intelligently adapt to the variable battery voltage).
8
EN_USER GUIDE //
8-STEP
1
2
3
4
5
6
7
8

Publicidad

loading

Productos relacionados para Inferno LCD710