1.8.3 Commissioning
Under the commissioning menu it is possible to adjust the several parameters:
PMEN0602 rev.0 - 05/2023
Air purge procedure:
• Duration
• Start air purge
Unit test run:
• Duration
• Mode (only for cooling mode)
• Start test run
Screed Drying:
• Circuit 1 setting temperature
• Circuit 2 setting temperature
• Start screed drying
1
61