Descargar Imprimir esta página

Ega Master 56584 Manual De Instrucciones página 47

Bomba hidráulica

Publicidad

Idiomas disponibles

Idiomas disponibles

ITEM
QTY.
20A.1
1
20A.2
1
20A.3
1
INSTALLATION OF 56571 MANIFOLD TO AN EXISTING PUMP
1. Remove existing couplers and fittings (fig 1) from Valve Block. (Keep for Reuse)
2. Clean oil and remove debris from Valve Block face surface.
3. Install nipple and couplers on to manifold (fig 2)
ADVANCE (Top Row) use the Female couplers
RETRACT (Bottom Row) us the fittings and male nipples.
Use Teflon tape on threads.
Torque to 37 lbf-ft / 50Mn
4. Use a small amount of white lithium grease to hold the O-Rings to the manifold. (fig 3)
5. Mount manifold assembly to Valve Block, using 6 socket head cap bolts. (fig 4)
Hand snug all bolts
Torque bolts to 9 lbf-ft / 12Nm
DESCRIPTION
female coupler
double 1/4" fitting
male nipple
TYPE
cejn
parker
cejn
47

Publicidad

loading

Este manual también es adecuado para:

565855659256593