ASSEMBLING YOUR PRODUCT
4. To install the footwell board,
turn stroller over and slide
footwell board into fabric at
center of stroller wagon.
5. Once footwell board is in
place, zip fabric closed as
shown.
6. To attach canopy, snap both
canopy mounts into place on
stroller wagon until an audible
click is heard.
NOTE: Canopy is a one-
side installation. Align
canopy mounts with slots
as shown.
7. Pull up on both sides of
canopy rings to make sure it
is locked into place.
10
CLICK!