Descargar Imprimir esta página

Toshiba RAV-HM301SDTY-E Manual De Instrucciones página 7

Ocultar thumbs Ver también para RAV-HM301SDTY-E:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 54
OM_D0X7303301-01_EN_Print.book Page 6 Friday, May 19, 2023 6:48 PM
• Install a circuit breaker that meets the specifications in the
Installation Manual and the stipulations in the local regulations and
laws.
• Install the circuit breaker where it can be easily accessed by the
agent.
• When installing the circuit breaker outdoors, install one which is
designed to be used outdoors.
• Under no circumstances, the power supply wire or the indoor and
outdoor connecting wire must be connected in the middle
(Connection using a solderless terminal etc.).
Connection trouble in the places where the wire is connected in the
middle may give rise to smoking and/or a fire.
• Electrical wiring work shall be conducted according to law and
regulation in the community and Installation Manual.
Failure to do so may result in electrocution or short circuit.
Test run
• Before operating the air conditioner after having completed the
work, check that the electrical control box cover of the indoor unit
and service panel of the outdoor unit are closed, and set the circuit
breaker to the ON position. You may receive an electric shock if the
power is turned on without first conducting these checks.
• If there is any kind of trouble (such as check code display has
appeared, smell of burning, abnormal sounds, the air conditioner
fails to cool or heat or water is leaking) has occurred in the air
conditioner, do not touch the air conditioner yourself but set the
circuit breaker to the OFF position, and contact a qualified service
person. Take steps to ensure that the power will not be turned on
(by marking "out of service" near the circuit breaker, for instance)
until qualified service person arrives. Continuing to use the air
conditioner in the trouble status may cause mechanical problems
to escalate or result in electric shocks or other trouble.
11-EN
• After the work has finished, use an insulation tester set (500V
Megger) to check the resistance is 1 MΩ or more between the
charge section and the non-charge metal section (Earth section).
If the resistance value is low, a disaster such as a leak or electric
shock is caused at user's side.
• Upon completion of the installation work, check for refrigerant leaks
and check the insulation resistance and water drainage. Then
conduct a test run to check that the air conditioner is operating
properly.
Explanations given to user
• Upon completion of the installation work, tell the user where the
circuit breaker is located. If the user does not know where the
circuit breaker is, he or she will not be able to turn it off in the event
that trouble has occurred in the air conditioner.
• After the installation work, follow the Owner's Manual to explain to
the customer how to use and maintain the unit.
Relocation
• Only a qualified installer (*1) or qualified service person (*1) is
allowed to relocate the air conditioner. It is dangerous for the air
conditioner to be relocated by an unqualified individual since a fire,
electric shocks, injury, water leakage, noise and/or vibration may
result.
• When carrying out the pump-down work, shut down the
compressor before disconnecting the refrigerant pipe.
Disconnecting the refrigerant pipe with the service valve left open
and the compressor still operating will cause air or other gas to be
sucked in, raising the pressure inside the refrigeration cycle to an
abnormally high level, and possibly resulting in rupture, injury, or
other trouble.
(*1) Refer to the "Definition of qualified installer or qualified service
person".
– 6 –
12-EN

Publicidad

loading

Este manual también es adecuado para:

Rav-hm401sdty-eRav-hm561sdty-eRav-hm801sdty-e