Descargar Imprimir esta página

CEMO DT-Mobil Easy 440l Manual página 25

Ocultar thumbs Ver también para DT-Mobil Easy 440l:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51
7. Maintenance and inspection
7.1
Safety measures
i
Important!
The operator must provide any protective clothing that may be required.
Who can carry out maintenance and inspection work?
» Normal maintenance work can be carried out by trained operating personnel.
7.2
Maintenance and inspection table
Interval
Assembly
As re-
Outside of fill-
quired
ing station
Tank
Monthly
Piping system
Moving parts of
the tank
Annually
Leakage probe
Action
Remove adhering dirt and diesel fuel.
Repair damage to the zinc coating by cold galvanizing or repair damage to
the paint with 2-component PU paint RAL 7036 "platinum grey".
Visual check for damage
Check hoses for cracks and porosity, check fittings for leaks (replace
defective parts)
Lubricate hinges and closure with a few drops of universal oil.
Visual and functional check as described in the LS-03 leakage probe
operating instructions.
GB
25

Publicidad

loading

Este manual también es adecuado para:

Dt-mobil pro pe 440l