Descargar Imprimir esta página

Kohler FREEWILL K-12209 Instrucciones De Instalación página 4

Ocultar thumbs Ver también para FREEWILL K-12209:

Publicidad

Idiomas disponibles

Idiomas disponibles

CONSTRUCT RECESS
Study the roughing-in diagram on Page 3.
Construct a recess with a header that is square vertically
and horizontally in accordance with the roughing-in
dimensions. Do not nail the header with 2x2 brace to
the stud frame until after the module is positioned in
the recess. If desired, install a 2x2 brace around the
recess opening.
If extra grab bars are specified: Provide 2x6 bridging or
attachment at specified positions. Refer to the grab bar
manufacturer's instructions.
Cut a 5" (12.7cm) diameter hole in the floor at the drain
location.
SEPARATE THE MODULE
Multi-piece modules are shipped assembled, and must be
separated for transportation into the installation area and
to apply sealant.
Prepare the floor or other level surface to temporarily set
the module sections on, preferably on a cloth or soft
padding to protect the joining surfaces.
Slide the alignment clips above the section joint, but do not
remove the clips completely.
Remove all nuts, washers, and bolts from the mounting
blocks, and set them aside for later use.
Carefully remove the module top section by lifting straight
up until it is free from the bottom section. Set the top
section aside temporarily.
Carefully move the sections to the installation area,
setting them on a prepared, level surface.
It is helpful to have all seam surfaces accessible for the
following steps.
1011311-2-A
84"
(213.4cm)
63"
(160cm)
6" Typ.
(15.2cm)
26-1/8"
20-1/2"
(66.4cm)
(52.1cm)
Alignment
Strip
Bolt
Washer
Mounting
Block
Washer
Nut
4
Nail Header With
2x2 Brace to
Framing After
Setting the Module
In the Recess
2x2
Braces
38-5/8"
(98.1cm)
29-5/8"
(75.2cm)
52-1/4"
(132.7cm)
Alignment Clip
Section Joint
(Joining
Mounting
Surfaces)
Block
Kohler Co., Kohler, WI U.S.A.

Publicidad

loading