Descargar Imprimir esta página

DST DR-31 T10 Manual Del Usuario página 11

Deshumidificador desecante

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4 INSTALLATION
4.1 UNIT INSTALLATION
Use the installation guidelines as a reference only.
4.2 GENERAL DUCT WORK INSTALLATION
for more information.
Install dry air out duct/channel at a high level.
Allow wet air to disperse freely when exiting the duct.
It is recommended to insulate the wet air duct.
4.3 DRY AIR OUTLET
Install a damper on dry air outlet to adjust the electric consumption during free blowing operation. Other models may require a damper to prevent from overloading during free
blowing operation.
It is recommended to adjust damper so that the electric consumption on the ammeter displays the nominal current stated in the technical data.
See heater current in
4.4 PROCESS AIR INLET
If there is a with "Process air inlet" on both inlet spigots, use the smaller air inlet spigot as the regeneration air inlet.
DR-31 T10 EN.05
.
A
A
11
EN
Seibu Giken DST

Publicidad

loading