Descargar Imprimir esta página

Veolia Sievers M Serie Guia De Inicio Rapido página 5

Publicidad

english
Installation Instructions
For more detailed instructions, refer to the Analyzer's
Note:
Operation and Maintenance Manual, downloadable from
www.sieversinstruments.com.
Step 1: Unpack and Inspect the
Analyzer
Step 2: Complete the
Identification Records
Complete page 3 of the Operation and Maintenance
Manual.
Step 3: Select a Location
Place the Analyzer away from direct sunlight and avoid
temperatures greater than 40 °C (104 °F) or lower than
10 °C (50 °F).
Mount the On-Line TOC Analyzer on a wall or a
support stand with the screen at eye level (or set it
on a workbench that can support its weight). Select
a stand or bench, and mounting bolts, to support
four times the weight of the instrument [total = 64.8
kg (142.40 lb)]. Allow a minimum of 5 cm (2 in.)
clearance between the back of the Analyzer and the
wall and 30.5 cm (12.0 in.) on the sides, top, and
bottom.
Place the Portable or Laboratory TOC Analyzer on a
clean surface that can accommodate the Analyzer's
dimensions and weight (See the
Step 4: Install the Reagent
Cartridges
Note: Installation instructions are for the type
Installation instructions are for the type
Note:
of reagent cartridge shown here. If installing
of reagent cartridge shown here. If installing
the other type with the red-and-green button
the other type with the red-and-green button
valve, refer to the Analyzer's Operation &
valve, refer to the
Maintenance Manual.
Maintenance Manual.
Reagent Cartridge
1. Ensure power is OFF and exercise ESD
protection.
2. Open the Analyzer door (On-Line) or remove the
right side panel (Laboratory and Portable).
specification
summary).
Analyzer's Operation &
quick start guide
3. Stabilize the Analyzer with one hand on the top
panel (Laboratory Analyzer) or handle (Portable
Analyzer). Grasp the edge of the right side panel
from the back of the Analyzer. Pull the entire panel
away from the Analyzer. (The panel is attached to
the Analyzer by magnets.)
4. Remove the reagent tray (Portable and Laboratory
models) or remove the reagent tray cover (On-
Line model).
5. Pull the yellow vent sticker off the bottom of the
Acid cartridge.
6. With the cartridge upright, remove the
containment tape from the inlet nozzle and
remove the plug.
7. Locate the Acid supply line, attach it to the top of
the Acid reagent cartridge, and tighten finger tight.
8. Place the Acid cartridge in the back compartment
of the reagent tray, ensuring that the nozzle-end
points out through the cutout.
9. Repeat steps 4-7 for the Oxidizer cartridge.
10. For Portable or Lab models, place the reagent tray
onto the unit floor. For On-Line models, carefully
replace the cover.
11.
Laboratory Reagent Tray
Step 5: Install the DI Water
System
1. Assemble the water
bottle and insert the fill
fitting into the Prime
port.
2. Fill the DI reservoir
with deionized water.
(Do not overfill. Ensure
that the reservoir float
is just below the top of
the window).
M-Series Quick Start Guide DQS 77000-03 MUL Rev A
On-Line Reagent Tray
Filling the DI Loop
5

Publicidad

loading

Productos relacionados para Veolia Sievers M Serie

Este manual también es adecuado para:

Sievers m9Sievers m9eSievers m5310 c