insulated wire which complies with UL Standard for the UPS battery wirings. The procedure
of installing battery bank should be complied with strictly. Otherwise you may encounter the
hazardous of electric shock.
1) A DC breaker must be connected between the battery pack and the UPS. The capacity
of breaker must be not less than the data specified in the general specification.
2) Set the battery pack breaker in "OFF" position and connect the 16 pieces of batteries
in series.
3) You must connect the external battery cable to the battery first, if you connect the
cable to the UPS first, you may encounter the hazardous of electric shock. The
positive pole of the battery is connected to the UPS with red wire; the negative pole of
the battery is connected to the UPS with black wire; the green and yellow ribbon wire
is connected to the ground of the battery cabinet.
3. To complete the connection of the external battery cable into the UPS. Do not attempt to
connect any loads to the UPS now. You should connect the input power wire to the right
position first. And then set the breaker of the battery pack in the "ON" position. After that
set the input breaker in the "ON" position. The UPS begins to charge the battery packs at the
time.
2.4 Connect Parallel Cables
1. Brief introduction
As long as the UPS is equipped with parallel cables, up to 4 UPSs can be connected in
parallel to realize output power sharing and power redundancy.
2. Parallel installation
1) Users need to opt two standard 15-pin communication cables which length is appropriate
to be less than 3m.
2)
Strictly follow the stand-alone wiring requirement to perform the input wiring of each
UPS.
3) Connect the output wires of each UPS to an output breaker panel.
4) All UPS can share the same battery pack.
5) Please refer to the wiring diagram in the next page, and opt suitable breaker.
The requirement of the output wiring is as follows:
It's recommended that the wires of output of the UPS to be less than 20m.
The difference between the wires of input & output of the UPSs is required to be less
than 10%.
The wiring diagram is shown as follows:
High Performance 6-10k UPS
Installation
13