Extract the terminal block from the inside wall fi xture and pass the cables through the base, fi xing the cable tie with the
screws provided.
EN
Fix the inside wall fi xture (4i) to the wall and execute the electrical connections as described in the following paragraphs.
Before making the connection, the power cables must be situated in the area of the outlet from the wall.
Pairing connection "MASTER - SLAVE" (RESPIRO-100 RD N / RESPIRO-150 RD N models)
If it has been planned to install one or more products cascaded from the main unit or to set this up for a future connection,
refer to the below images to enable communication between the main unit and the cascaded units.
We advise you to use different coloured cables to avoid inverting the connections.
28
Take the inside wall fi xture (4i) and the tools
needed to connect the mains network to the ter-
minal block.
Properly connect and secure the mains power
cables to the terminal block. "N" and "L" indi-
cation.
Opposite to Master
Same as Master
Opposite to Master