Descargar Imprimir esta página

CEMO CUBE-Tank Mobil 980I Basic Manual De Instrucciones página 29

Sistema de depósito móvil para diésel

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. Maintenance and inspection
7.1
Safety measures
i
Important:
The operator must provide any protective clothing that may be required.
Who can carry out maintenance and inspection work?
» Normal maintenance work may be carried out by trained operating personnel.
i
Important:
Inspections of the filling station may only be carried out by an authorised, registered inspection
agency with respect to the ADR approval.
7.2
Maintenance and inspection table
Interval
Assembly
As re-
Outside of fill-
quired
ing station
Container
Monthly
Line/hose
system
Moving parts of
the tank
Annually
Leakage probe
Every
two and
Filling station
a half
years
7.3
Troubleshooting
Fault
Possible cause
Pump is run-
1. Ball valve on delivery line
ning, but no
output
Reduced pump
1. Hoses are blocked or kinked.
output
2. Air bubbles in the liquid
1. Blade fuse defective
Pump not run-
2. Thermal overload protection
ning
7.4
Explanations regarding recurring
tests and inspections
Please note that the transport approval for all com-
bination IBCs with a plastic inner tank for diesel is
limited to 5 years. After this period, the inner tank
for diesel must be renewed. We offer you this tank
replacement service incl. test certificate in accord-
ance with the ADR.
Action
Remove adhering dirt and diesel fuel.
Visual check for damage
Check hoses for cracks and porosity, check valves for leaks (replace defec-
tive parts).
Lubricate hinges and lock with a few drops of universal oil.
Visual and functional check as described in the LS-03 leakage probe oper-
ating instructions.
Inspection according to ADR 6.5.4.4.1 b) and 6.5.4.4.2
- Documentation in the test report (see section 10)
- If the test is passed – record on type plate (month/year)
closed
has been triggered.
Solution
1. Open ball valve
1. Check hoses
2. Leave the tank to stand for a few minutes
1. Blade fuse is located at the +terminal in a
housing, replace it
2. Operating time too long. Leave to cool down, if
it occurs again during normal operation contact
technical service
In addition, in accordance with ADR 6.5.4.4.1 b),
the filling station must undergo inspection to the
satisfaction of the responsible authority at intervals
not exceeding two and a half years with regard to
the external condition and proper functionality of
the operating equipment.
GB
29

Publicidad

loading

Este manual también es adecuado para:

Cube-tank mobil 980i premium1163211637