Descargar Imprimir esta página

Hayward ENERGYLINE PRO ENPI7M Manual De Instalación E Instrucciones página 76

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 92
6. APPENDIX (continued)
6.2 Heating priority wiring for monophasic pump
Dry contact 16 A max
OUT2
Power supply
230V
/ 50Hz
Monophasic pump
Terminals 1 and 2 deliver a potential-free dry contact,
230V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
28

Publicidad

loading