Descargar Imprimir esta página

Hayward ENERGYLINE PRO ENPI7M Manual De Instalación E Instrucciones página 77

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 92
6. APPENDIX (continued)
6.3 Heating priority wiring for three phases pump
L1
1L1 3L2 5L3
2T1 4T2
Terminals 1 and 2 deliver a potential-free dry contact,
230V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
L2
L3
N
13N0
A1
6T3
14N0
A2
L3
L2
L1
Three phases pump
4
5
6
7
1
2
3
8
= = = =
R S
Power supply
400V 3N
Dry contact 16 A max
OUT2
=
=
T N
1 2
/ 50 Hz
29

Publicidad

loading