Descargar Imprimir esta página

COMEM eDOC Manual De Instrucciones página 5

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Preparing for installation
This chapter provides information relevant to the steps
that should be performed prior to installing the Oil diag-
nostic device type eDOC.
Tools for installation
Here are the various tools necessary to install the eDOC.
Tools supplied by COMEM
• 5 mm Allen key
• L key
• M25x1.5 Cable gland (n°2)
Spare Parts
O-ring No. 1
(eDOC enclosure)
O-ring No. 2
(eDOC brass fitting) already
installed on product
Plugs
Bleeding hose (ID. 1/8")
Table 1
Additional tools (not supplied by COMEM)
• Laptop with Internet Explorer 9 or above
(for product commissioning)
• Straight Ethernet cable (for product commissioning)
• 2 in wrench or adjustable wrench (50.8 mm)
• Roll of PTFE tape
• Bucket and rags
• Wire stripper
• Wire cutter
• Flat head screwdriver
• Optical termination equipment if installing the optional
optical Ethernet port
(1) The eDOC commissioning can be done without laptop see chapter "Commis-
sioning (without web interface)" on page 11.
Necessary protection equipment
Safety shoes
Gloves
Protective glasses
O.R. 4875 – NBR
(Dimensions: D3,53xD221,8)
O.R. 4175 – NBR
(Dimensions: D3,53xD44,04)
To cover unused cable gland ports
For sampling
(1)
Unpacking
The eDOC is supplied in a cardboard box with internal
shock absorbing packaging. Always transport the product
in the packaging supplied to minimize the risk of damage.
Handling
The product is designed to withstand many industrial
environmental conditions.
However, a few handling precautions will ensure reliable
operation of the unit for years to come:
• DO NOT DROP the eDOC.
• It is not recommended to open the eDOC if it is raining
or snowing.
• Always turn off power at the electrical panel before
doing any installation or adjustment.
• Do not expose the product internal electronics to any
liquids or dirt.
• Ensure that the cable glands are tight after connection
and that all cable glands contain a cable (in case not,
replace them with the spare plugs).
• Make sure the cover is well secured with the supplied
o-ring once connections inside the eDOC have been
completed (see "Removing the cover" on page 9).
While the initial (cold start) accuracy of the product is likely to
be within specifications, a settling period of approximately 24
hours is strongly recommended to allow the electronic compo-
(1)
nents to fully warm up and the internal temperature to stabilize.
NOTE
5

Publicidad

loading