Final Preparation; User Instruction - Erreka MAGIC Manual Del Instalador

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

INSTALLATION
5

FINAL PREPARATION

Connections and checks
F
< 400N in spaces between 50 mm and 500 mm
d
F
< 1400N in > 500 mm spaces
d
Programming the operations
In dual leaf facilities without brake or encoder,
the following should be taken into account when
programming the operations:
when programming closing for leaf 2, once the leaf
reaches the closing stopper wait for a time equal to
the lapse between leaves before pressing ST1 to
finish programming. This ensures that during the
closing operation, leaf 2 remains at the closing
stopper during the lapse, until leaf 1 closes
completely.
58
Installation Manual
1 Install an electrolock to lock the door in closing
position. This is necessary for models MAS210 and
MAS250, along with the other models, if the length
of the leaf is over 1.8 m.
See the electrolock instructions.
2 Carry out the installation and the connections for all
the elements of the facility, in line with the control
board instructions.
3 Check that the mechanism is correctly regulated.
The torque regulator of the control board must
be adjusted in a manner which respects the
values indicated in standard EN 12453:2000, as
shown
in
the
measurements must be made in line with the
method described in standard EN 12445:2000.
4 Check the operation of all the installation elements,
especially the protection systems and the manual
operation unlocking system.

User instruction

1 Instruct the user with regards to the use and
maintenance of the installation and provide him/her
with the user manual.
2 Signpost the door, showing that it opens
automatically and indicating how to operate it
manually. Where appropriate, indicate that
operation is using the remote control.
attached
chart.
The

Publicidad

Tabla de contenido
loading

Tabla de contenido