MB/RAB
6 Operation
7 Removal from service
1 Open the shielding gas cylinder.
2 Switch on the power supply.
3 Setting the welding parameters.
4 Welding is started.
NOTICE
• Liquid-cooled hose assemblies may start leaking if overheated. This is
why the cooling unit should continue running for approx. 5 min. after
welding.
1 Welding is stopped.
2 Wait until the shielding gas flow has subsided and switch off power supply.
3 Close the valve of the shielding gas cylinder.
6 Operation
EN - 9