Assembling The Equipment - SICE A 92 Manual De Instrucciones

Alineadora de ruedas computerizada
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 173
Failure to observe these instructions can lead to damage to the machine and injury to
operators or other persons.
- Unpack the equipment, placing the packaging in the position shown by the markings on it.
- Unpack the personal computer.
- Remove the monitor from its packaging.
- Assemble the column (7, Fig 1), consisting of 2 parts.
- Install the shelf (2, fig.1).
- Install the PC Box (4, fig.1) and insert the PC.
- Remove the rear panel of the column.
- Connect the USB hub (HUB, Figure 2) to a free USB port on the back of the PC.
- Install keyboard, mouse and printer by connecting to the USB HUB (HUB, fig.2).
- Install the monitor stand to the monitor and mount them on the column (1, Figure 1), using the
provided screws.
-Connect the printer to the main supply via the power strip located inside the bottom of the
column.
-Connect the monitor to the PC and the power supply, through the power strip located inside the
bottom of the column.
- Mount the beam (6, Figure 1) using the provided screws.
From the lower opening of the Beam out of 4 USB type cables and 1 power type.
Bring 4 USB cables inside the PC Box through the rear hole (L1-C1-L2-C2, Fig. 2).
- Connect the 2 camera USB cable with 2 USB ports on the back of the PC (C1-C2, Figure 2).
- Connect the 2 USB cables with molded ferrite (Cuboled cards) to the USB HUB (L1-L2, Figure
2).
- Connect the Beam power cord to +12 V switching power supply output (PS, Figure 2), paying
attention to the polarity (BROWN wire = +12 V, BLUE wire = GROUND).
- Leave disconnected the cable with 9-pin connector versions without moving the beam.
- Connect the switching power supply to the power supply (PS, Fig. 2).
- Connect the PC to the mains supply (Fig. 2) via the strip placed inside the lower part of the
column.
- Connect the cables with the aid of the wiring diagram (Fig. 40); all the plugs are clearly
indicated on their respective PC sockets. Push the plugs in completely without straining and,
where applicable, tighten the lock screws.
- The aligner wheel is factory-set to operate with a mains voltage of 230Vac. The wheel aligner
may be configured to operate with a mains voltage of 115Vac.
- Refit the rear panel of the column, fastening with the specific tool provided.
- Connect the power supply cable to the plug provided; first read the "Electrical Hook-up" section.
- Turn on the aligner with the main switch and the monitor and the printer with the specific
switches.
- Update the wheel aligner software if necessary, "Updating the Wheel Aligner Software" section,
and install any optional kits, "Installing Additional Functions" section.
Insert the software protection key supplied in a free USB port of the USB HUB (SP, Figure 2).
The software protection key is required to use the aligner.

Assembling the equipment

Software protection key installation
52

Publicidad

Tabla de contenido
loading

Productos relacionados para SICE A 92

Tabla de contenido