Bosch VLH 2155 Manual De Usuario página 33

Ocultar thumbs Ver también para VLH 2155:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 61
3.5.2
Installing locking pawl cable
1. Pull the cable through all cable guides in accordance
with the cable routing diagram.
Fig. 18:
Cable routing diagram
1 Control lever
2 Latching mechanism at control column
3 Cable guides (metal tube)
4 Cable guide (Bowden cable sheath)
5 Cable
6 Latching mechanism at secondary column
Control column:
2. Fit the cable at the control column as shown
in Fig. 20.
!
Firmly tighten the lower threaded nipple (4).
Make sure the wire loop is properly positioned in
the recess of the pin. Do not yet tighten the upper
threaded nipple (1).
Secondary column:
3. Fit the cable at the secondary column as shown in
Fig. 19.
4. Tension the cable and tighten the threaded
nipple (3).
5. Actuate the control lever and check operation
of the locking pawl. Re-adjust if necessary.
Control column:
6. Press down and tighten the upper threaded
nipple (1).
7. Actuate the control lever and check operation of
both locking pawls. Re-adjust if necessary.
Robert Bosch GmbH
Installation | VLH 2155 | 33
Fig. 19:
Latching mechanism at control column
1 Threaded nipple with packing plate
2 Coil spring (broad)
3 Coil spring (narrow)
4 Threaded nipple
5 Pin at control lever
Fig. 20:
Latching mechanism at secondary column
1 Coil spring (narrow)
2 Coil spring (broad)
3 Threaded nipple with packing plate
4 Locking pawl
en
|
1 689 978 583
2017-07-14

Publicidad

Tabla de contenido
loading

Tabla de contenido