Lorentz PS150 Boost Manual De Instalación Y Operación página 25

Sistemas de bombas solares sumergibles
Ocultar thumbs Ver también para PS150 Boost:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Terminal Description: PS150 to PS200 (non UL)
Figure 4: Terminal PS150 to PS200 (non UL)
̶
+
Table 4: Terminal explanation
Socket
Terminal
POWER IN
Well probe
Float switch
Jumper:
Battery Mode
Output to
motor
1 2 3 4 5 6 7
Connection
+
connect to positive terminal of PV module
connect to negative terminal of PV module
1
connection to NC
2
connection to COM
3
connect N.O.
4
connect ground
5
connect N.C.
6
connect cable jumper for battery mode
7
connect cable jumper for battery mode
L1
connect to the L1 phase of the motor
L2
connect to the L2 phase of the motor
L3
connect to the L3 phase of the motor
Controller Installation
L1
23
L2
L3

Hide quick links:

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido