Function Of The Unit; Overview A; Built-In Safety Tests; Built-In Hand Pump (3) And Connecting Hose (6) Test - Rothenberger ROTEST GW 150/4 Instrucciones De Uso

Ocultar thumbs Ver también para ROTEST GW 150/4:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 26
3

Function of the Unit

3.1
Overview
2
tank
3
hand pump
5
manometer
6
connecting hose
7
tube element (fixed)
tube element (41-75 hPa/41-75
8
mbar)
tube element (81-115 hPa/81-115
9
mbar)
tube element (121-155 hPa/121-155
10
mbar)
12
bellow
13
conical gas test plug, size 0
* = accessorie with version 6.1701
4

Built-in safety tests

Carry out the safety tests integrated in the ROTEST GW 150/4 before commissioning the
instrument and in regular intervals. Ensure that the instrument is functions properly before use.
4.1

Built-in hand pump (3) and connecting hose (6) test

 Close all cut-off valves on your ROTEST 150/4.
 Insert connecting hose (6) to connecting valve A. An auditable sound is heard when hose
and valve nipple are properly locked.
 Use hand pump to increase system pressure to 0,3 MPa (3 bar).
 Wait 10 minutes for loaded air and water temperatures to equalize.
Prolong period of temperature equalization if temperatures fluctuate greatly!
 Carry out test over a period of ten minutes. The indicated pressure should not drop over a
10 minute period.
4.2

Built-in bellow (12), water column and connecting hose (6) test

 Close all cut-off valves on your ROTEST GW 150/4.
 Insert connecting hose (6) to connecting valve B. An auditable sound is heard when hose
and valve nipple are properly locked.
 Assemble tube element system as follows:
while carefully turning insert tube element (8) with scale 41-75 hPa (41-75 mbar) into fixed
tube element (7).
while carefully turning insert tube element (9) with scale 81-115 mbar hPa (81-115 mbar)
into tube element (8).
 Open connecting valves B,C and D.
 Use bellow (12) to load a pressure of 150 hPa (150 mbar) into the test system.
 Close connecting valve C to avoid a loss in pressure.
 Wait 10 minutes for loaded air and water temperatures to equalize.
14
conical gas test plug, size 1
15
conical gas test plug, size 2
16
cylindrical gas test plug, size 1
17
cylindrical gas test plug, size 2
adapter for gas
21
appliances
22*
supply-end cap
35
silicon lubricant
36
O ring (spare)
37
instruction manual
ENGLISH
A
11

Publicidad

Tabla de contenido
loading

Tabla de contenido