- if present, remove the cast-iron rings and/or the sheet-metal
perforated panels A from the outlets where the air ducting pipes
are to be connected;
- secure the supplied galvanised fittings B to the product cover, at
the outputs to be channelled;
- secure the ducting pipes C to the galvanised fittings B using the
supplied hose clamps D;
- in the case of channelling a product with four upper outputs, it
is advisable to use the front ones (see example A in the figure)
where most of the heat accumulates;
If the product is supplied with CARTER CLOSED ON THE
BOTTOM SIDE
Remove ALL the knockouts located on the bottom side
of the carter to facilitate the air circulation.
- bend the two ends of the galvanized support brackets 90°,
where the motor unit of the Wind Air kit will be fixed;
24
ENGLISH
C
D
B
A
A
A