en
24 | 1 687 010 182 | Testing
5.4
Description of pump test
Once the test has been started and automatic mode
has been activated, the waiting and measuring times
begin as soon as the specified setpoints are attained.
After the times have elapsed, the software automati-
cally switches to the next test step and saves the test
results in the test log.
When the last test step is reached and the measuring
times have elapsed, the test bench comes to a stop and
the test is complete. Press <F12> to call up the test log.
|
1 689 989 055
2015-10-01
6.
Maintenance
6.1
Service intervals
Service work
Check hoses (refer to Section. 6.2)
To be performed by testing body / customer service during
*)
maininspection
6.2
Check hoses
Always handle hoses (high-pressure and low-pressure hos-
es) with care and check for damage prior to use. Hoses
are to be replaced if checking reveals the following:
R
Cracks, brittle areas, abrasion or blistering at the
hose jacket
R
Kinked hose
R
Stiff union nuts or quick-release couplings
R
Deformed or damaged hose connection end (sealing
cone, plug-in nipple, etc.)
R
Leakage at fitting
R
Corrosion at fitting if strength is reduced as a result
R
Service life exceeded (refer to Section 6.3)
!
Damaged hoses are not to be repaired.
6.3
Replace high-pressure hose
Replace high-pressure hoses (operating pressure great-
er than 60 bar) after 3 years (refer to date of manufac-
ture on high-pressure hose) even if there are no appar-
ent defects of relevance to safety.
X
X
Robert Bosch GmbH