EHEIM Skimmarine300 Manual De Instrucciones página 16

Ocultar thumbs Ver también para Skimmarine300:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
English
4.
Commissioning
Installation in the aquarium (⌦A)
Attention! Strong magnets! Danger of crushing!
▶ Separate the magnets by twisting them.
▶ Place the magnets at a distance of 30 cm away from each other.
1. Remove all transport securing devices (e.g. adhesive tape, filling material etc.), particularly inside the skimmer.
2. With one hand, hold the skimmer at the desired position in the aquarium from the inside.
3. With the other hand, carefully place the magnet half with logo b onto the glass panel at a distance from the
skimmer (from the outside). Ensure that the magnet does not strike against the glass panel!
4. Move the magnet half in the direction of the skimmer on the glass until both magnet halves a/b lie one above
the other.
Laying the mains cable (⌦B)
1. Guide the mains cable out of the small side opening and then guide it between the connecting pieces for cable
guide c .
The correct cable guide is indicated by a line.
5.
Operation
Start position
1. Position the skimmer so that the water level of your aquarium is between water level max. and water level min.
d on the skimmer (⌦C).
2. Set the air adjustment controller to the middle position (⌦D).
Following initial commissioning, the skimmer must "run in". This can take up to
one week. The skimmer usually starts to produce foam within the first 2 days. During this time, residual air may
escape at the outlet. This is no cause for concern. Following the running-in period, no further residual air will
escape.
Switching on the pump
1. Insert the mains plug in the mains socket. Attention: The pump starts immediately!
Switching off the pump
1. Remove the mains plug from the mains socket.
Fine adjustment (⌦D)
For an optimal skimmer performance, a fine adjustment of the appliance should be carried out following the "running in"
phase. Set the skimmer performance according to your requirements via the air adjustment controller (⌦C).
Ozone connection (⌦E)
1. Remove the cover and open the predetermined breaking pointf for the hose introduction.
2. Remove the protective sleeve.
3. Attach the hose (Ø 6 mm) for the ozone feed to the connecting piece g.
16

Publicidad

Tabla de contenido
loading

Tabla de contenido