Figure 6, Solenoid Lead And Motor Vibrator Lead Connection Block - Kemper Clean Air Tower Manual De Uso

Ocultar thumbs Ver también para Clean Air Tower:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 155
Connect the dust chute pipe (item 1) with the filler pipe (item 3) with the hose
NW60 (item 2) and secure them with jubilee clips.
Connect the plug (M12) for the three solenoid leads on the sockets (items 1, 2
and 3) of the connection block. The sequence does not matter here.
Connect the motor vibrator plug with the 4-pin socket (item 4).
Connect the earth lead to the bolt M4 (item 5).

Figure 6, Solenoid lead and motor vibrator lead connection block

• Connect the compressed air supply line (blue, D=8mm) to the plug connection
(item A).
• Connect the drainage line (white/natural color, D=8mm) to the plug connection
(item B).
• Connect the differential pressure line (transparent, D=6mm) with the plug
nipple on the hose (item C).
Part no.: 150 2627 (CAT 2.0)
All rights over changes without prior notice and errors reserved.
KEMPER CleanAirTower 2.0 Operating instructions - EN
- 62 -
Rev.: 00
Issue: 02/2017

Publicidad

Tabla de contenido
loading

Tabla de contenido