Cable Guide Mount Installation - SRAM Quadq Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40
C A B L E G U I D E M O U N T I N S T A L L A T I O N
The Cable Guide Mount should only be used when the cable guide is fastened with a screw. If the cable guide is
fastened with a rivet, use the Bottom Bracket Cup Mount or Adhesive Putty instead.
Do not allow the magnet to contact the power meter. When properly installed, the magnet should be in line with
the cadence sensors and within 2-8 mm (1/16"-3/8") of the sensors.
1. Remove the existing cranks.
2. Loosen the cable guide screw. It may be helpful to shift the front derailleur to the small chainring position, and
the rear derailleur to the smallest cog. This will reduce the cable tension, and make it easier to slide the cable
guide mount under the cable guide.
3. Slide the mount under the cable guide. The guide can be installed with the magnet pointed down (as
illustrated) or up.
4. Reinstall the cranks.
5. Tighten the cable guide screw.
6. Confirm the magnet is within 2-8 mm (1/16"-3/8") of the sensor.
N O T I C E
2-8 mm
(1/16"-3/8")

Cable Guide Mount installation

9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0815Quarq 0808Quarq 0815

Tabla de contenido