BK Precision 1672 Manual De Usuario página 16

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9.4
TEST EQUIPMENT REQUIREMENTS
(only required when doing a performance verification test)
The following instruments will be required to test the complete installa-
tion of the unit.
1). A 4½ Digit Multimeter for verifying the output voltage and current.
2). A 20 MHz dual channel oscilloscope for verifying the Ripple in the DC
Output/s.
3). A Resistive load to suit the maximum output current from the unit de-
pending on the model and capacity.
4). A Standard calibrated current shunt to measure the output current.
15

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido