Completion (finalizing installation)

• All electrical connections must be correct
• All safety devices must have been checked concerning proper function
• All modes of operation of unit must have been tested
• All mechanical parts must be securely tightened. Even if no adjustments have been carried out
on mechanical parts ALL setting screws and connection screws of
o Spring
o Spring pole
o Barrier pole must be checked.
• The control unit must be closed tightly and in accordance with regulations
• The strain relief at the bottom of the control has to be checked and, if necessary, tightened