The control elements must be placed so that the installed unit can be seen.
Danger due to foreign bodies and dirt entering the unit.
The ingress of even tiny foreign bodies causes serious damage to the unit with probable breakage of the impeller blades and the danger
of debris being thrown out.
ATTENTION!
Danger due to vibration. Regularly check the fixing of the unit to the support structure. Excessive vibration of
the unit can seriously damage the machine.
ATTENTION!
If installed outdoors, protect the unit against the sun and weather.
NOTE FOR THE
Vibration dampers are supplied with machines from K03 to K06 MS GVR.
USER
On request, vibration dampers are also available on the other machines.
Installation of the unit must always be done using vibration dampers.
Installation of the unit must ensure that motor ventilation is not impeded by obstacles placed in the immediate vicinity.
Connect the pipes using flexible sleeves, without resting the weight of the pipes on the unit (with the exception of a possible filter in
case of suction in the place).
Determine the dimensions a, b, c to allow adequate space for installation of the unit with its accessories (Dimensions available in
the first section).
To avoid overloads caused by pressure fluctuations, install a bypass pressure-relief valve on the suction pipe in
case of operation as an exhauster, and on the delivery when operating as a blower.
If the flow rate has to be reduced, use a bypass valve instead of throttling the suction or delivery.
Protect the suction pipe with a filter with max. degree of filtration 25µm. For the use of filters with filtration
different from 25µm, ask FPZ. Foreign bodies are: dust, sand, gravel, dirt in the pipes, cutting burrs and
shavings, welding slag and spatter, metal burrs and sealant residuals produced when connecting the pipes.
Change the filters regularly.
Size the pipes and choose accessories that minimise pressure losses; therefore:
do not fit pipes narrower than the ports of the machine.
when installing several machines in parallel, suitably size the manifold and the main line.
use large-radius curves and not elbows.
do not install valves with a smaller flow than nominal and check valves with shutter opposed by spring (the check valve with
lowest pressure loss is the lightened non-return valve).
when used for oxygenation, choose diffusers with low flow resistance (low pressure loss).
See the INSTALLATION DIAGRAMS in the first section.
FPZ-MI-K MS-GOR/GVR-EU-R00-15
42 / 122

Publicidad

Tabla de contenido
loading

Productos relacionados para FPZ K03-MS

Este manual también es adecuado para:

K05-msK06-msK07-msK75-msK08-msK10-ms ... Mostrar todo

Tabla de contenido