C A L I B R A T I N G T H E B L A N K H O L D E R
3.3.1
Milling the measuring surfaces
▷ Start the Ceramill Motion software and connect
E N
to the Ceramill Motion 2 (5X).
▷ Click on the
Fig. 8
▷ Make sure that the machine is set up according
to the necessary data of the following window
and confirm with
The milling data are transferred.
▷ After completion of the data transfer, reset the
tool wear for all tools.
Fig. 9
▷ To start the milling process, click on the
button.
Two plane surfaces are milled into the calibra-
tion sleeve.
22
Open program file(s)
OK
.
▷ Under the
Blank-Holder-4-Calibration_1
fer the
button.
The milling procedure is completed after approx.
20 minutes and the operation button [A] starts to
flash. After the milling process, the tool holder
remains in the removal position.
There is no indication in the Ceramill
Motion software that the process has been
completed.
▷ Remove the tool holder from the machine.
▪ Release the lever of the splash guard and pull
off the splash guard toward the front.
▪ Loosen the fastening screw of the tool holder
and pull off the tool holder toward the right.
▷ Clean the locating bore and the surfaces of the
machine.
Test Programs
tab, select and trans-
program.