Installation
Preparing the installation
Caution!
Ensure that there are no electric wires, gas or water
pipes in the area where holes are to be made.
1
Mark a vertical centre line on the wall from the
ceiling to the lower edge of the extractor hood.
2
Mark positions for the screws and the contour of
the attachment area.
3
Drill five 8 mm diameter holes to a depth of 80 mm
for the attachments and press in the wall plugs
flush with the wall.
26
Installation
1
Screw on the fixing bracket for the flue duct.
2
Screw on brackets for the extractor hood hand-tight.
Do not firmly tighten the screws.
3
Screw in the threaded bolt, leaving it protruding out
of the wall by 5–9 mm.
¨
©
ª