Granita Production - Frigomat Vibe-Gel 05 Serie Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

15 - ENGLISH
5.4 "GRANITA" PRODUCTION
After the machine has been installed according to the
instructions reported in chapter 3 and carefully
cleaned and sanitized according to the instructions
reported in chapter 6, proceed as follows to start up
the granita production:
-
Check that the master switch is closed, the STOP
pushbutton is lighted up and the water supply
cock is open.
-
Lift the hopper cover and pour the mixture into
the cylinder. Observe the suggested minimum
and maximum quantities per cycle according to
the following table:
MODELL
VIBE GEL
The non-observance of the minimum and maximum
batch values can cause the malfunction of the
machine and, sometimes, serious damages.
-
Replace the cover on the hopper to prevent dust
and other impurities from getting in contact with
the mixture.
-
Select the desired time period of granita by
means of the 6-position selector. Refer to above
table for the selection on the pushbutton-panel.
Led
1
2
3
4
5
6
-
Press contemporarily the pushbutton STOP and
PRODUCTION to start up the granita production.
During the cycle the compressor will always be in
function, meanwhile the agitator will stop for 10
sec. and move for 2 sec. During the production
the "security timer" will be activated and in case of
freezing failure, after 15 min. it will stop the
machine.
MIN (LITRES)
MAX (LITRES)
8
granita time period (min)
2
4
6
8
10
12
12

Publicidad

Tabla de contenido
loading

Tabla de contenido